The Downland Gridshell
Conservation Store and Workshop
[Back to Gridshell
Construction Index]
[Index of Buildings] [Home]
Lowering the Gridshell
March 2001 - The Process begins.....

Interior view showing the yellow jacks in place

Close up of the top of a jack and its adjusting
ring.

At 12.30 pm on March 2nd 2001 the great descent
begins as
Diana Zeuner lowers the first jack by 40mm.
19th March 2001
Two weeks on and the edges of the gridmat have
been lowered by up to three metres and the characteristic curved shape is
beginning to appear.
[Next:
Lowering the Gridshell- Halfway Down!]