Erection of Structural Deck and End Frames
October 2000
First deliveries are received of the green oak laths that will be
jointed to form the gridshell structure

November 2000
The floor is cut to shape, covered in waterproof felt and
construction board to prevent damage and the ingress of water during construction of the
gridshell.

The ends of the Glulam beams are shaped and the soffits are
attached and shaped.

The first gable end is placed in position.

Detail showing connection of the arch to the lower floor structure

[Next:
Erection of the Scaffolding Platform]