Construction of Floor to Workshops
September 2000
Concrete is poured to fill the cavity between the the blockwork.
This method of construction with an inner and outer skin of blockwork with steel
reinforcing and poured concrete in the cavity is designed to provide a simple to build
structure capable of withstanding the loads from the building and the soil backfill which
will surround most of the building. This method avoids the need for expensive shuttering
and provides a fair face for the internal walls. The blocks were sourced locally.


The GLULAM beams forming the first floor are positioned and joined
and protected from the elements
.

October 2001
Packs of pre machined timbers for the floor are delivered and
laying commenced at the beginning of the month.