The Downland Gridshell
Conservation Store and Workshop
[Back to Gridshell
Construction Index]
[Index of Buildings] [Home]
Lowering the Gridshell
April 2001 - Halfway down .....
The following pictures were taken on April 7th
2001


Over 60 tons of scaffolding have been removed at
this point and the sides of the gridmat are supported by jacks positioned at
angles to remove excessive cantilever loading on the structure.


April 20 - Finally down.


Minor adjustments to the shape will be carried
out before the addition of shear blocks for strengthening and fixing of the
shell to the curved panels at the edge of the deck.
[Next:
Fixing the Gridshell]
[Back to Gridshell
Construction Index]
[Index of Buildings] [Home]