The Downland Gridshell
Conservation Store and Workshop

[Back to Gridshell Construction Index] [Index of Buildings] [Home]

Lowering the Gridshell

April 2001  - Halfway down .....

The following pictures were taken on April 7th 2001

Gridshell lowering 50% complete

 

gridshell closeup 7 april 2001

Over 60 tons of scaffolding have been removed at this point and the sides of the gridmat are supported by jacks positioned at angles to remove excessive cantilever loading on the structure.

gridshell showing jacks supporting cantilevered sections

 

Gridshell side of gridmat 7 April 2001

April 20 - Finally down.

Gridshell lowered into position April 20 2001

 

Gridshell lowered into position April 20 2001

Minor adjustments to the shape will be carried out before the addition of shear blocks for strengthening and fixing of the shell to the curved panels at the edge of the deck.

[Next: Fixing the Gridshell]